Nonchromate Aluminum Pretreatments
Project Number: S-00-OC-016

Meeting and Teleconference Summaries

The Meeting and Teleconference Summaries contains basic information about this project and a summary paragraph from each meeting or teleconference held for this project.

Contractors: Boeing:Aerospace Applications, Electric Boat: Electrical Connectors, General Dynamics: Defense Systems, Raytheon: Defense Systems, UDLP: Defense Systems

Potential Programs/Owners: Advanced Amphibious Assault Vehicle, Bradley Fighting Vehicle, C-130, CVNX Tactical Tomahawk, DD21, E-2/C-2, E/A-6B, F/A-18, F-14, F-15, F-16, F-22, H-46, H-53, H-60, JSOW, P-3, S-3, Shuttle External Tank, Shuttle Solid Rocket Boosters, Sidewinder Aim 9X, Standard Missile V-22, Virginia Class Submarine

Material(s) Targeted for Reduction/Elimination:
Hexvalent Chromium

Phase(s) in Methodology:
I, Identification and II, Technical



Milestones and Prior Decisions:

  • Preliminary JG-PP CBA was performed at five facilities:
    • Kennedy Space Center
    • Marine Corps Logistics Base - Albany
    • Naval Aviation Depot
    • Oklahoma City Air Logistics Center
    • Red River Army Depot.
  • Technical representatives identified preliminary lists of proposed alternatives as well as proposed platforms for demonstration:
    • AC-131 (formerly Boegel)
    • Alodine 5200/5700
    • Bi-K Aklimate
    • Brent Chemcoat Oxsilan 0500
    • Chemidize 727D
    • Sanchem Safeguard 7000
    • TCP
    • X-it Prekote.
  • Technical representatives agreed that, as general validation criteria, potential alternatives must perform as well as or better than chromate conversion coatings by themselves (bare/unpainted) or with representative coating systems.
  • Leverage previous work including:
    • JG-PP, Chrome-Free Conversion Coating Project (HMSC)
    • Army, Non-Chrome Coating Process and Organosilane Pretreatment Process
    • NAVAIR, Alternatives to Chrome Conversion Coatings
    • Air Force, nonchromated conversion test and evaluation.
  • Specifications and standards for verifying technology include:
    • Conversion coatings
      • AMS-2474B
      • AMS-2473E
      • MIL-C-5541E
      • MIL-DTL-81706A
    • Paints
      • MIL-C-22750
      • MIL-C-53039A
      • MIL-DTL-64159
      • MIL-P-53022B
      • MIL-P-53030A
      • MIL-P-85582B
      • MIL-PRF-23377G
      • MIL-PRF-85285C
    • Tests
      • ASTM B 117-97
      • ASTM D 2803-93
      • ASTM D 3359
      • ASTM D 714
      • ASTM G 85-94

Date of Last Meeting: June 5, 2001
Next Scheduled Meeting:
To be determined

Meeting and Teleconference Summaries:

On June 5, 2001, representatives from the Army, Navy, Air Force, NASA, and OEM's met with representatives from the JG-PP Working Group. The purpose of the meeting was to review and finalize the JTP and initiate the approval process. All objectives were met.

On August 15-16, 2000, representatives from the Army, Navy, Air Force, NASA and OEM's met with representatives from the JG-PP Working Group. The purpose of the meeting was to discuss Phase I testing, acquiring signatures for the JTP and review funding issues for the ESTCP/JG-PP Nonchromate Aluminum Pretreatments Project. All objectives were met.

On January 25-26, 2000, representatives from the Army, Navy, Air Force, NASA and OEM's met with representatives from the JASPPA. The purpose of the meeting was to kick-off the ESTCP/JG-PP Nonchromate Aluminum Pretreatments Project, and to begin identifying potential alternative technologies and performance requirements for qualifying alternatives.

 

 

Related Topics
Project Matrix and Points of Contact

Current Project Activity

Meeting and Teleconference Summaries

Technology Survey

Potential Alternatives Report

Joint Test Protocol

Joint Test Report

Miscellaneous Reports


Information Sheet

Project Summary

 